Minimum spanning trees
What is the cost of the minimum spanning tree?
Examples
Worked example
Input
Triangle edges AB = 1, BC = 2, AC = 5
Expected output
3
Hints and solution
Hint 1
Write down the starting state and walk through one example by hand.
Reveal worked answer
Take AB and BC. They connect all three vertices at total cost 3, so AC would only add a cycle.